SAP E-S4HCON2022 certification exam is a highly respected certification that validates the knowledge and skills of SAP professionals in the latest SAP technologies. It is a must-have for IT professionals who work with SAP systems and want to enhance their career prospects. SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade certification exam is comprehensive and requires a deep understanding of SAP S/4HANA, its functionalities, and its architecture. Passing E_S4HCON2022 exam ensures that one is equipped with the knowledge and skills to perform successful SAP S/4HANA conversions and system upgrades.

 

NEW QUESTION # 30
What are the benefits of using the benchmarking option of the DMO for SUM? Note There are 2 correct answers to this question

  • A. You can record the modification adjustment during migration and use the transports in the next runs.
  • B. You can obtain migration duration tiles from a previous benchmark run that can be used to optimize the next runs
  • C. You can verify that the content of the download directory matches the stack XML file.
  • D. You can find the optimal number of parallel H3load processes by monitoring host performance

Answer: B,D


NEW QUESTION # 31
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question

  • A. Perform an SAP S/4 HANA conversion including DMO
  • B. Perform an SAP S/4 HANA conversion without DMO
  • C. Upgrade the SAP system
  • D. Apply SAP support packages
  • E. Use DMO for SUM

Answer: C,D,E


NEW QUESTION # 32
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

  • A. Network capacity between exporting and importing R3load processes must be.
  • B. The target database size increases temporarily because of the Shadow Repository.
  • C. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • D. The source system is non-Unicode and the target database is a scale-out system.
  • E. SAP HANA Landscape Reorganization required a manual step to edit a file.

Answer: C,E


NEW QUESTION # 33
What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.

  • A. The SI checks are executed in the development system and the results are transported into the subsequent systems
  • B. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework
  • C. You need to build up an SI check framework by applying SAP Notes
  • D. The errors from the SI checks must be solved, otherwise. SUM will report an error

Answer: B,C


NEW QUESTION # 34
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SWPM using the Backup / Restore procedure
  • B. SUM without DMO
  • C. SWPM using the Load procedure
  • D. SUM with DMO

Answer: C


NEW QUESTION # 35
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question

  • A. Check the log files written in the SUM directory subdirectory abap. subdirectory log
  • B. Check logs for jobs starting with RSUPG_SGEN in the SAP system.
  • C. Check the Charts Control Center in the SUM Ul
  • D. Check the dump size of the database export on disk.

Answer: A,D


NEW QUESTION # 36
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.

  • A. The upgrade of the PRD must be finished before you start new development in the DEV.
  • B. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
  • C. The transport between Unicode and non-Unicode systems is forbidden.
  • D. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.

Answer: B


NEW QUESTION # 37
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

  • A. It is a database-specific document.
  • B. It explains the database migration option (DMO) of SUM.
  • C. It contains a section about the simplification item (SI) checks.
  • D. It explains where to find information about the custom code analysis.

Answer: C,D


NEW QUESTION # 38
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for target release, Windows, SAP MaxDB
  • B. Kernel for target release, Windows, SAP HANA
  • C. Kernel for source release, Windows, SAP MaxDB
  • D. Kernel for target release, Linux, SAP HANA

Answer: B,C


NEW QUESTION # 39
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

  • A. The repetition option allows you to run the migration without a shadow system
  • B. The repetition option allows you to repeat the complete migration
  • C. The benchmaking option allows you to migration a specified set of tables
  • D. The benchmaking option allows you to repeat the uptime migration

Answer: C


NEW QUESTION # 40
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • B. By searching for transport requests that are assigned to the project SAP_ADJUST
  • C. By searching for transport requests in the file umodauto.Ist
  • D. By searching for transport requests named <SID>K0<number>

Answer: C


NEW QUESTION # 41
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

  • A. To optimize the activation
  • B. To optimize the main import
  • C. To optimize the conversion
  • D. To optimize the migration

Answer: D


NEW QUESTION # 42
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:

  • A. An upgrade of the software components is performed, without changing the database type.
  • B. An SAP S/4HANA conversion is performed, without adapting the customer data.
  • C. A change of the database type is performed, without changing the software components.
  • D. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.

Answer: C


NEW QUESTION # 43
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A. SAP S/4HANA conversion including database migration and Unicode conversion
  • B. Unicode conversion Database migration SAP S/4HANA conversion without database migration
  • C. Unicode conversion SAP S/4HANA conversion without database migration Database migration
  • D. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
  • E. Unicode conversion SAP S/4HANA conversion including database migration

Answer: B,D,E


NEW QUESTION # 44
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:

  • A. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
  • B. Import of upgrade and language data from the download directory in phase TABIM UPG
  • C. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • D. Activation of dictionary objects in phase ACT_UPG
  • E. Import of dictionary objects from the download directory in phase DDIC_UPG

Answer: B,D,E


NEW QUESTION # 45
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

  • A. The end of the database migration
  • B. The end of the business downtime
  • C. The start of the business downtime
  • D. The start of the Execution roadmap step

Answer: B


NEW QUESTION # 46
In ICNV. How database operations synchronized between the source and the target table?

  • A. Deletes are directly executed in the target table by delete trigger.
  • B. AA

Answer: A


NEW QUESTION # 47
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

  • A. SAP S/4HANA conversion without DMO
  • B. DMO without system update
  • C. Benchmark tool
  • D. SAP S/4HANA conversion including DMO
  • E. Prerequisite check

Answer: A,D,E


NEW QUESTION # 48
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:

  • A. Assign the transport request as a modification adjustment transport
  • B. Release the transport request containing the modification adjustment
  • C. Manually activate the adjusted dictionary objects
  • D. Create "modified* versions of the objects that you need to adjust

Answer: A,D


NEW QUESTION # 49
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

  • A. Release upgrade
  • B. Dual Stack split
  • C. Support Package Stack update
  • D. Homogenous system copy
  • E. Database migration

Answer: A,C,E


NEW QUESTION # 50
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. SAP ECC system from SAP ERP 6.0 EHP 8
  • B. SAP Solution Manager 7.2
  • C. Standalone AS ABAP with SAP_BASIS 752 and above
  • D. SAP S/4HANA Server 1809 and above

Answer: C,D


NEW QUESTION # 51
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Perform the migration of data into the new data structure
  • B. Check the compatibility of custom code with SAP S/4HANA
  • C. Run the database migration to the SAP HANA database
  • D. Apply the recommendations of the simplification list

Answer: B,D


NEW QUESTION # 52
......


SAP E-S4HCON2022 exam is designed for professionals who have experience in SAP system conversions or upgrades. E_S4HCON2022 exam covers topics such as system architecture and configuration, data migration, validation and testing, and project management. It is a comprehensive exam that requires a deep understanding of the SAP system and the ability to apply that knowledge to real-world scenarios.

 